Sheet Pile of Gudang Baru Connecting Channel Finally Repaired
Reported by Wuri Setyaningsih | Translated by Nugroho Adibrata
We have repaired it. This is our support toward development of RPTRA
South Jakarta Water Resources Sub-dept. finally has repaired the Gudang Baru Connecting Channel's sheet pile in Matoa RPTRA, Jagakarsa, South Jakarta.
"We have repaired it. This is our support toward development of RPTRA," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resources Sub-dept., Friday (5/19).
Setu Channel's Sheet Pile in Ciganjur RepairedAccording to him, sheet pile itself has 1.5-2 meters height with 250 meters length. It is repaired in order to ward off landslide in future.
"After doing this, the surroundings look neat and beautiful. Repair takes place about three months," he stated.
Besides that, the sub-dept. is also repairing another sheet pile as long as 200 meters in Jagakarsa Sub-district, namely Sada Connecting Channel on Jalan Purowa. Currently, its process has touched 60 percent.